On a slope, every wheelbarrow load is hard work. The line runs uphill or down to the forms, so your crew can focus on placing and finishing.
- Uphill or downThe line follows the slope to the forms.
- Controlled pourWalls are filled at the pace your crew sets.
- Tight spotsThe line fits through 5-inch gaps and around corners.
What we pump
- Cast-in-place retaining walls
- Stair flights and landings
- Terraced garden walls
- Block wall fill, and footings for block and rock walls
- Walls and stairs for builders and landscapers
Before pump day
- Forms braced for the full wall height
- Engineered walls checked or inspected as required
- For stairs, tell us the number of steps and whether they're solid or on a slab
- A clear route for the line
Stairs are easy to underestimate. The concrete calculator has a stair option.
Common questions
Do I need an engineer for my retaining wall?
Often, for taller walls. In Saanich, Colwood, Nanaimo and North Cowichan, for example, a retaining wall over 1.2 m (4 ft) needs a building permit and a professional engineer. Other Island municipalities have similar rules, so check with yours before you book.
Can you pump stairs on a steep slope?
Yes. Send us a photo of the slope and where the truck can park, and we'll confirm the line route.
Get a quote for your pour
Send the address, rough volume and pour date. We'll check access and line length and send you a price.
Other services: Slabs and driveways · Footings and foundations · Patios, walkways and pool decks · Commercial and contractor pours
Areas: Langford and the Westshore · Victoria · Saanich and the Peninsula · Sooke · Cowichan Valley · Nanaimo and Mid Island · Salt Spring and the Gulf Islands
Last updated October 29, 2026